• SCADA system for heat networks SiDiO

    SiDiO is an implementation of supervisory control and data acquisition (SCADA) system for remote monitoring and control of district heating networks. The system provides complete visibility and management tools to improve the energy efficiency and network performance...

    READ MORE
  • Heat Substations for wall mounting

    The district heat substations Dalsia Brunata W is a complete plug and play solution for wall mounting. Dalsia Brunata W provides efficient heating while being compact and easy for transportation, installation and operation...

    READ MORE
  • Brunata Futura+ heat cost allocator

    Designed for safe remote reading Brunata Futura+ has all the modern features you need - radio transmission, dual-sensor reading, non-volatile memory, replaceable battery. Compatible with EN834.

    READ MORE

The prophylactic of the substation is mandatory before the start of the heating season. It is carried out by technical personnel and includes the review of the facility, cleaning of filter elements, settings, and more.

 

Open the radiator valves

Before the start of the season, all radiator valves in the building should be open to the maximum of five days. This has to be done in order to release the radiator from the air. Otherwise, the radiator would not warm well.

 

Check electronic heat cost allocators

Brunata advises clients to check the screens of electronic heat cost allocators. If the screen is off or faded, it is necessary to contact us for battery replacement or if the customer wishes – device replacement.

 

When the apartment is empty

In cases where the home will not be used, customers can apply for zero-forecast consumption in the office of Brunata. This requires the written consent and signatures of at least two neighbors and building manager.